A TYPICAL BACNET BUILDING FLOOR 3 VAV box Thermostat MS/TP trunk FLOOR 2 VAV box Thermostat MS/TP trunk FLOOR 1 Lighting Metering MS/TP trunk MECHANICAL ROOM Chillers · AHUs · Boilers MS/TP vBT-02 BACNET/IP BMS IP backbone MS/TP does the last mile. BACnet/IP does the backbone. vBT-02 bridges them.

BACnet doesn’t get talked about as much as it should, given how much of the built environment runs on it. Between BACnet MS/TP and BACnet/IP, the two variants account for the large majority of building automation projects worldwide — and despite BACnet/IP’s growing share at the backbone level, MS/TP isn’t going anywhere at the field-device level any time soon.

Two protocols, one building

Most real BACnet installations aren’t “IP” or “MS/TP” — they’re both, in a fairly consistent pattern. A building controller sits in the mechanical room speaking BACnet/IP up to the BMS software. Downstream of that controller, VAV boxes, thermostats, lighting panels and metering devices sit on one or more MS/TP trunks — RS485, low cost, no switch hardware required, easy to daisy-chain along a floor.

That split exists for good reasons. MS/TP is cheap and robust for a floor’s worth of simple field devices. IP is what you want for the backbone linking controllers, servers and workstations together. Neither side is going to absorb the other.

Where that leaves integrators

The friction shows up whenever something needs to cross that boundary in a way the original design didn’t anticipate: a retrofit that needs to reach an MS/TP trunk from a new IP-based head end, a metering subsystem that only speaks Modbus feeding into an otherwise all-BACnet building, or a controller with more MS/TP-only field devices than it has ports for.

These aren’t exotic problems. They’re the normal texture of a mixed-vintage building automation project.

What we’re building

We’re extending the same DIN-rail platform behind vMT-02 to speak BACnet. Two variants are in development, both targeting Q4 2026:

vBT-02 bridges BACnet MS/TP field trunks to BACnet/IP directly — the pattern in the diagram above.

vMBT-02 goes a step further and bridges Modbus RTU to BACnet directly, for sites where metering or process equipment on Modbus needs to report into a BACnet-based BMS without a separate gateway box.

Both are still in development, so we’re not publishing full specifications yet — but if either one matches a project you’re scoping for later this year, get in touch and we’ll keep you posted as they get closer to release.

← Zurück zum Blog